-
30
Jan 2018
- Category: Aggiornamento cantieri
- Written by archei
- Hits: 2033
CONTRACT OBTAINED - VIMAR PRODUCTION SITE
Among the latest orders obtained by Archei we find the new production center VIMAR. With a value of around €3.5 million, work is scheduled to begin in March 2018.
An authoritative team of designers, the integrated urban and architectural design has been entrusted to the studio of Architettura 5+IAA srl, involved in the project the architect Alfonso Femia; for the plant and structural design the studio FOR Engineering Architecture; General Contractor (client for Arche)i: Italiana Costruzioni Spa.
Archei's contribution includes the installation of FACCIATE CONTINUE, as shown in the project images in the image gallery.
